• About
  • Advertise
  • Privacy & Policy
  • Contact
  • Our Team
Saturday, February 21, 2026
  • Login
Metakhabar
  • Home
  • News
    ‘Nepal Evening’ programme held in Canada

    ‘Nepal Evening’ programme held in Canada

    International Mother Language Day today

    International Mother Language Day today

    Three held with counterfeit notes

    Two more arrested in Dang for allegedly burning UML flag

    60 cameras installed for tiger counting go missing

    Nepal and India should work for stronger digital trade systems, says FNCCI Chair Dhakal

    Nepal and India should work for stronger digital trade systems, says FNCCI Chair Dhakal

    Nepal-Portugal bilateral consultation mechanism meeting concludes

    Nepal-Portugal bilateral consultation mechanism meeting concludes

    Trending Tags

    • Trump Inauguration
    • United Stated
    • White House
    • Market Stories
    • Election Results
  • Auto
  • International
  • Business
  • Entertainment
    Music Video “Mutu Bhitra Dhadkan” Capturing the Beauty of Mustang Released

    Music Video “Mutu Bhitra Dhadkan” Capturing the Beauty of Mustang Released

    Trash barrier installed to capture floating waste in Bagmati River

    Trash barrier installed to capture floating waste in Bagmati River

    Young actor, entrepreneur, and social activist Krishna Sunar was honored

    Young actor, entrepreneur, and social activist Krishna Sunar was honored

    Weather to remain fair in most parts of country

    Possibility of rain in Koshi, Gandaki and Karnali

    Tongue piercing festival in Madhyapurthimi today

    Tongue piercing festival in Madhyapurthimi today

    Ganga Sonam wins title of Nepal Idol Season-6

    Ganga Sonam wins title of Nepal Idol Season-6

  • Sports
  • नेपाली
No Result
View All Result
  • Home
  • News
    ‘Nepal Evening’ programme held in Canada

    ‘Nepal Evening’ programme held in Canada

    International Mother Language Day today

    International Mother Language Day today

    Three held with counterfeit notes

    Two more arrested in Dang for allegedly burning UML flag

    60 cameras installed for tiger counting go missing

    Nepal and India should work for stronger digital trade systems, says FNCCI Chair Dhakal

    Nepal and India should work for stronger digital trade systems, says FNCCI Chair Dhakal

    Nepal-Portugal bilateral consultation mechanism meeting concludes

    Nepal-Portugal bilateral consultation mechanism meeting concludes

    Trending Tags

    • Trump Inauguration
    • United Stated
    • White House
    • Market Stories
    • Election Results
  • Auto
  • International
  • Business
  • Entertainment
    Music Video “Mutu Bhitra Dhadkan” Capturing the Beauty of Mustang Released

    Music Video “Mutu Bhitra Dhadkan” Capturing the Beauty of Mustang Released

    Trash barrier installed to capture floating waste in Bagmati River

    Trash barrier installed to capture floating waste in Bagmati River

    Young actor, entrepreneur, and social activist Krishna Sunar was honored

    Young actor, entrepreneur, and social activist Krishna Sunar was honored

    Weather to remain fair in most parts of country

    Possibility of rain in Koshi, Gandaki and Karnali

    Tongue piercing festival in Madhyapurthimi today

    Tongue piercing festival in Madhyapurthimi today

    Ganga Sonam wins title of Nepal Idol Season-6

    Ganga Sonam wins title of Nepal Idol Season-6

  • Sports
  • नेपाली
No Result
View All Result
Metakhabar
No Result
View All Result
Home Auto

PM Oli observes opening of Ghattepakha-Dhedre tunnel under Fast Track Project

Metakhabar by Metakhabar
August 5, 2024
in Auto, Business, Featured-news, News, Society
0
PM Oli observes opening of Ghattepakha-Dhedre tunnel under Fast Track Project
0
SHARES
6
VIEWS
Share on FacebookShare on Twitter

Makawanpur, Aug 5: Prime Minister KP Sharma Oli today observed the ‘breakthrough’ of the Ghattepakha-Dhedre Tunnel developed under the Kathmandu –Terai/Madhesh Expressway (Fast Track).  The Express Highway project remains a project of national pride and strategic importance.

The breakthrough ceremony for the 1.728-kilometer-long tunnel was held at Dhedre of Bakaiya rural municipality-12. Another Dhedre tunnel, measuring 1.653 kilometers, towards the Nijgadh-Kathmandu side had already been completed.  With this, the opening of tunnels under package 11 is now complete. The Prime Minister activated a switch for the breakthrough of the tunnel.

The implementation of the project is being undertaken by the Nepali Army.

On the occasion, Chief of the Army Staff, Prabhu Ram Sharma, apprised the Prime Minister about the progress so far and the challenges in regard to the project implementation. He said that to date the project reports 35.98 percent progress.

The construction of the 1.612 kilometer-long tunnel towards the Nijgadh-Kathmandu at Lendanda and the 1.633 kilometer-long tunnel towards Kathmandu-Nijgadh section has been already over.

Presently, the construction of the 3.322 km long Mahadevtar Tunnel towards Nijgadh-Kathmandu reports the completion of 2.29 kilometers, while the 3.386 km long tunnel towards Kathmandu-Nijgadh has reached up to 2.88 kilometers. The opening of the both tracks is expected within a year.

The project is being implemented by dividing it into 13 packages, and out of the 89 bridges to be constructed under it, 85 are at various stages of construction.

The sites for the remaining four bridges are based in Khokana area of Lalitpur and the progress has been hampered due to disputes over the land acquisition.

The NA expects to complete the fast track project by mid-April, 2027.

The starting point is Khokana in Lalitpur and the final point is Nijgarh in Bara. The length of the road is 70.977 kilometers. The expressway will be 25 meters wide in hilly terrain and 27 meters wide in Terai terrain.

Six tunnels with a length of 10.399 km will be built on the expressway. Under the project, one km long tunnel will be constructed in Devichaur, 0.39 km in Sisautar, 2.25 km in Chandram Bhir, 3.355 km in Mahadevdanda, 1.691 km in Dhedre and 1.623 km in Lendanda.

Similarly, 89 bridges with a length of 12.885 kms will be constructed at different places on that road. Two rest stops in Budune and one interchange and toll plaza each in Khokana, Budune and Nijgarh will be constructed under the project.

According to the decision of the Council of Ministers on 4 May, 2017, the responsibility of construction management of the project has been given to the Nepali Army.

The then Prime Minister Pushpa Kamal Dahal ‘Prachanda’ laid the foundation stone of the project at Nijgarh in Bara on 28 May 2017. The government handed over the project to the Army from the Road Department on 11 August 2017.

Deputy Prime Minister and Minister for Finance Bishnu Paudel, Physical Infrastructure and Transport Minister Devendra Dahal, Defence Minister Manveer Rai, Forest and Environment Minister Ain Bahadur Shahi and Ambassadors of China and South Korea to Nepal were present in the event.

Previous Post

Thai ambassador calls on Foreign Minister Dr Rana

Next Post

Nine passengers injured after falling tree hits moving micro bus

Metakhabar

Metakhabar

Next Post
Nine passengers injured after falling tree hits moving micro bus

Nine passengers injured after falling tree hits moving micro bus

Please login to join discussion
‘Nepal Evening’ programme held in Canada
Featured-news

‘Nepal Evening’ programme held in Canada

by Metakhabar
February 21, 2026
0

Kathmandu, Feb 21: The Nepali Embassy in Ottawa, Canada in coordination with the Nepal Tourism Board (NTB), recently organized a...

Read more
International Mother Language Day today

International Mother Language Day today

February 21, 2026
Three held with counterfeit notes

Two more arrested in Dang for allegedly burning UML flag

February 21, 2026

60 cameras installed for tiger counting go missing

February 21, 2026
Nepal and India should work for stronger digital trade systems, says FNCCI Chair Dhakal

Nepal and India should work for stronger digital trade systems, says FNCCI Chair Dhakal

February 21, 2026

Aanjan Media Private Limited Kathmandu, Nepal

Chairman

Dhiraj Paudel

Registration No:

3634-2079/80

Contact

01-4521648
metakhabar7@gmail.com

  • About
  • Advertise
  • Privacy & Policy
  • Contact
  • Our Team

© 2022 MetaKhabar

No Result
View All Result
  • Home
  • News
  • Tech
  • Entertainment
  • Lifestyle
  • Society
  • Auto
  • Education

© 2022 MetaKhabar

Welcome Back!

Login to your account below

Forgotten Password?

Retrieve your password

Please enter your username or email address to reset your password.

Log In