• About
  • Advertise
  • Privacy & Policy
  • Contact
  • Our Team
Friday, February 20, 2026
  • Login
Metakhabar
  • Home
  • News
    By-election: Silence period begins

    13 days to HoR Elections: EC opens TikTok competition for election publicity

    Prime Minister Oli taking vote of confidence today

    UML election manifesto: Rs 25,000 minimum wage

    Nepali Congress’s manifesto made public

    NC rule from 2046 to 2051 BS was ‘golden era,’ asserts President Thapa

    UML informs parliament secretariat about withdrawal of support to government

    CPN (UML) unveils its election manifesto

    PM Karki addresses Democracy Day function; says HoR elections to open door to new era

    PM Karki addresses Democracy Day function; says HoR elections to open door to new era

    Nepal-Portugal Bilateral Consultative Mechanism Meeting on Friday

    Nepal-Portugal Bilateral Consultative Mechanism Meeting on Friday

    Trending Tags

    • Trump Inauguration
    • United Stated
    • White House
    • Market Stories
    • Election Results
  • Auto
  • International
  • Business
  • Entertainment
    Music Video “Mutu Bhitra Dhadkan” Capturing the Beauty of Mustang Released

    Music Video “Mutu Bhitra Dhadkan” Capturing the Beauty of Mustang Released

    Trash barrier installed to capture floating waste in Bagmati River

    Trash barrier installed to capture floating waste in Bagmati River

    Young actor, entrepreneur, and social activist Krishna Sunar was honored

    Young actor, entrepreneur, and social activist Krishna Sunar was honored

    Weather to remain fair in most parts of country

    Possibility of rain in Koshi, Gandaki and Karnali

    Tongue piercing festival in Madhyapurthimi today

    Tongue piercing festival in Madhyapurthimi today

    Ganga Sonam wins title of Nepal Idol Season-6

    Ganga Sonam wins title of Nepal Idol Season-6

  • Sports
  • नेपाली
No Result
View All Result
  • Home
  • News
    By-election: Silence period begins

    13 days to HoR Elections: EC opens TikTok competition for election publicity

    Prime Minister Oli taking vote of confidence today

    UML election manifesto: Rs 25,000 minimum wage

    Nepali Congress’s manifesto made public

    NC rule from 2046 to 2051 BS was ‘golden era,’ asserts President Thapa

    UML informs parliament secretariat about withdrawal of support to government

    CPN (UML) unveils its election manifesto

    PM Karki addresses Democracy Day function; says HoR elections to open door to new era

    PM Karki addresses Democracy Day function; says HoR elections to open door to new era

    Nepal-Portugal Bilateral Consultative Mechanism Meeting on Friday

    Nepal-Portugal Bilateral Consultative Mechanism Meeting on Friday

    Trending Tags

    • Trump Inauguration
    • United Stated
    • White House
    • Market Stories
    • Election Results
  • Auto
  • International
  • Business
  • Entertainment
    Music Video “Mutu Bhitra Dhadkan” Capturing the Beauty of Mustang Released

    Music Video “Mutu Bhitra Dhadkan” Capturing the Beauty of Mustang Released

    Trash barrier installed to capture floating waste in Bagmati River

    Trash barrier installed to capture floating waste in Bagmati River

    Young actor, entrepreneur, and social activist Krishna Sunar was honored

    Young actor, entrepreneur, and social activist Krishna Sunar was honored

    Weather to remain fair in most parts of country

    Possibility of rain in Koshi, Gandaki and Karnali

    Tongue piercing festival in Madhyapurthimi today

    Tongue piercing festival in Madhyapurthimi today

    Ganga Sonam wins title of Nepal Idol Season-6

    Ganga Sonam wins title of Nepal Idol Season-6

  • Sports
  • नेपाली
No Result
View All Result
Metakhabar
No Result
View All Result
Home Auto

Bahrabise substation construction completed

Metakhabar by Metakhabar
June 23, 2024
in Auto, Featured-news, News, Society
0
Bahrabise substation construction completed
0
SHARES
2
VIEWS
Share on FacebookShare on Twitter

Kathmandu, June 23: The construction of Bahrabise substation, which is considered important for connecting Sindhupalchok and surrounding districts to the national power grid, has been completed.

There are 160 MVA, 132/11 kV and 5 MVA power transformers in the substation with a total capacity of 220/132 kV. Testing of all equipment of the substation based on Gas Insulated System (GIS) technology has been completed. Another substation of 400 kV is also under construction at Bahrabise, it is said.

Under the leadership of Chilime Hydropower Company, a subsidiary of Nepal Electricity Authority (NEA), the power of the 120 megawatt Mid-Bhotekosi hydropower project built in Sindhupalchowk will be connected to this substation.

According to NEA, the Bahrabise substation will be charged using the same electricity after the production of electricity from the Mid-Bhotekosi hydropower project. During the testing of structures and equipment to start electricity generation from the project, the tunnel is currently being repaired after water leaked from it.

NEA Executive Director Kulman Ghising said that the tunnel repair is being done with the aim of completing it by the second week of August. A high-level delegation including Ghising on Saturday monitored the repair work of the substation, transmission line and tunnel at Madhyabhotekosi and asked the project management and contractor company to complete the entire work before the stipulated time.

In course of the inspection, Executive Director Ghising mentioned that since the construction of Bahrabise substation, there is no problem for the electricity generated from the Mid-Bhotekosi to connect to the national grid.

The power generated from the Mid-Bhotekosi Project would be connected to the Bahrabise substation via the 220 kV transmission line. The NEA Executive Director Ghising said the Project has already constructed the tower for the around four-kilometre 220 kV  single circuit transmission line from the switch yard of the powerhouse up to the Bahrabise substation.

Cable has been stretched on around two kilometres of the transmission line. According to Ghising, the Project has not been able to fix the cable on the remaining two kilometres due to the protest by the locals of Palanti at Ward Nos 3 and 4 of Bahrabise municipality.

Previous Post

HoR session:  Sharma calls for apprehending Rai over cooperative fraud case

Next Post

Dalit Justice Defenders Conference takes place in Kathmandu

Metakhabar

Metakhabar

Next Post
Dalit Justice Defenders Conference takes place in Kathmandu

Dalit Justice Defenders Conference takes place in Kathmandu

Please login to join discussion
By-election: Silence period begins
Featured-news

13 days to HoR Elections: EC opens TikTok competition for election publicity

by Metakhabar
February 20, 2026
0

Kathmandu, Feb 20: The Election Commission (EC) is set to use the popular social media platform for election publicity. In...

Read more
Prime Minister Oli taking vote of confidence today

UML election manifesto: Rs 25,000 minimum wage

February 20, 2026
Nepali Congress’s manifesto made public

NC rule from 2046 to 2051 BS was ‘golden era,’ asserts President Thapa

February 20, 2026
UML informs parliament secretariat about withdrawal of support to government

CPN (UML) unveils its election manifesto

February 19, 2026
PM Karki addresses Democracy Day function; says HoR elections to open door to new era

PM Karki addresses Democracy Day function; says HoR elections to open door to new era

February 19, 2026

Aanjan Media Private Limited Kathmandu, Nepal

Chairman

Dhiraj Paudel

Registration No:

3634-2079/80

Contact

01-4521648
metakhabar7@gmail.com

  • About
  • Advertise
  • Privacy & Policy
  • Contact
  • Our Team

© 2022 MetaKhabar

No Result
View All Result
  • Home
  • News
  • Tech
  • Entertainment
  • Lifestyle
  • Society
  • Auto
  • Education

© 2022 MetaKhabar

Welcome Back!

Login to your account below

Forgotten Password?

Retrieve your password

Please enter your username or email address to reset your password.

Log In