• About
  • Advertise
  • Privacy & Policy
  • Contact
  • Our Team
Monday, September 7, 2026
  • Login
Metakhabar
  • Home
  • News
    NDRRMA records recovery of 1,341 bodies; 4,996 in missing list since Bhotekoshi floods

    NDRRMA records recovery of 1,341 bodies; 4,996 in missing list since Bhotekoshi floods

    Bhotekoshi flash flood: 199 dead bodies in unrecognizable condition managed

    Aug 26 disaster: Sample collection from 1,181 dead bodies for DNA matching

    Nepali Kickboxer Ghimire achieves title of world champion

    Nepali Kickboxer Ghimire achieves title of world champion

    Madi-Thori road blocked due to water overflow

    Bhotekoshi flood: 3,071 people remain unaccounted for in Rasuwa

    Top End T20 Series Nepal facing Pakistan today

    ACC Premier Cup: Nepal fielding against Saudi Arabia

    350 people trapped in Upper Trishuli Hydropower Tunnel rescued alive

    Bhotekoshi floods: Rescue team reaches sixth storey of Rasuwagadhi Hydropower tunnel

    Trending Tags

    • Trump Inauguration
    • United Stated
    • White House
    • Market Stories
    • Election Results
  • Auto
  • International
  • Business
  • Entertainment
    World of Dance Nepal 2026 Launched with U.S. Embassy Support

    World of Dance Nepal 2026 Launched with U.S. Embassy Support

    Music Video “Mutu Bhitra Dhadkan” Capturing the Beauty of Mustang Released

    Music Video “Mutu Bhitra Dhadkan” Capturing the Beauty of Mustang Released

    Trash barrier installed to capture floating waste in Bagmati River

    Trash barrier installed to capture floating waste in Bagmati River

    Young actor, entrepreneur, and social activist Krishna Sunar was honored

    Young actor, entrepreneur, and social activist Krishna Sunar was honored

    Weather to remain fair in most parts of country

    Possibility of rain in Koshi, Gandaki and Karnali

    Tongue piercing festival in Madhyapurthimi today

    Tongue piercing festival in Madhyapurthimi today

  • Sports
  • नेपाली
No Result
View All Result
  • Home
  • News
    NDRRMA records recovery of 1,341 bodies; 4,996 in missing list since Bhotekoshi floods

    NDRRMA records recovery of 1,341 bodies; 4,996 in missing list since Bhotekoshi floods

    Bhotekoshi flash flood: 199 dead bodies in unrecognizable condition managed

    Aug 26 disaster: Sample collection from 1,181 dead bodies for DNA matching

    Nepali Kickboxer Ghimire achieves title of world champion

    Nepali Kickboxer Ghimire achieves title of world champion

    Madi-Thori road blocked due to water overflow

    Bhotekoshi flood: 3,071 people remain unaccounted for in Rasuwa

    Top End T20 Series Nepal facing Pakistan today

    ACC Premier Cup: Nepal fielding against Saudi Arabia

    350 people trapped in Upper Trishuli Hydropower Tunnel rescued alive

    Bhotekoshi floods: Rescue team reaches sixth storey of Rasuwagadhi Hydropower tunnel

    Trending Tags

    • Trump Inauguration
    • United Stated
    • White House
    • Market Stories
    • Election Results
  • Auto
  • International
  • Business
  • Entertainment
    World of Dance Nepal 2026 Launched with U.S. Embassy Support

    World of Dance Nepal 2026 Launched with U.S. Embassy Support

    Music Video “Mutu Bhitra Dhadkan” Capturing the Beauty of Mustang Released

    Music Video “Mutu Bhitra Dhadkan” Capturing the Beauty of Mustang Released

    Trash barrier installed to capture floating waste in Bagmati River

    Trash barrier installed to capture floating waste in Bagmati River

    Young actor, entrepreneur, and social activist Krishna Sunar was honored

    Young actor, entrepreneur, and social activist Krishna Sunar was honored

    Weather to remain fair in most parts of country

    Possibility of rain in Koshi, Gandaki and Karnali

    Tongue piercing festival in Madhyapurthimi today

    Tongue piercing festival in Madhyapurthimi today

  • Sports
  • नेपाली
No Result
View All Result
Metakhabar
No Result
View All Result
Home Auto

Construction of motorable bridges over before deadline

Metakhabar by Metakhabar
June 18, 2024
in Auto, Featured-news, News, Society
0
Construction of motorable bridges over before deadline
0
SHARES
10
VIEWS
Share on FacebookShare on Twitter

Khotang, June 18: Two motorable bridges along the Diktel-Chakhewabhanjyang road section have been constructed before the time limit.

The bridges were constructed over the Bhalukhola stream of Solma, Majhuwagadhi municipality-2, and over the Mewakhola stream of Nerpa, Majhuwagadhi-6. The road section belongs to the Mid-Hill Highway.

The construction company was contracted with the Road Department two years back with the timeframe of completing the undertaking before July 6, 2024. The cost for bridges was Rs 77.4 million.

Both newly constructed bridges are 20-meter long each. Even the approach roads were completed.

General Secretary of Khotang Transport Pvt, Ram Hingmang, informed that road transportation was eased after the construction of two motorable bridges.

In the same road section, another 20-meter long bridge has also been completed before deadline. The motorable bridge is built over the Chhepekhola stream located in the border of Nerpa and Solma. The Sagarmatha JV was contracted for building the infrastructure.

Representative of the construction company, Krishna Ghimire, informed that as the undertaking was over and the bridge also came into operation, the company was ready for dispensation to the Road Department and receiving last tranche.

Chief of District Coordination Committee, San Bahadur Rai, said they had directed the construction companies frequently to maintain quality and complete the bridges on time. “We encouraged the construction company to complete the undertaking on time. It was not possible to conclude the construction before rains, but they did,” he said, adding that they were planning to award the contractor.

Meanwhile, the Siruwa Construction Kathmandu failed to complete the bridge over Pankhukhola stream that links Buwasung to Lamidanda, resulting into cancellation of the contract. The contract was terminated on May 25.

The locals have been worried over the indifference of the concerned sectors to intensify the works of bridge construction, which would ease transportation to Bhojpur from the district.

Previous Post

Flights disrupted at Lukla for ten days, tourists stressed out

Next Post

SGM community mourns Dhimal, hormone therapy debate continues

Metakhabar

Metakhabar

Next Post
Dhimal’s death raises concern about hormone therapy in Nepal

SGM community mourns Dhimal, hormone therapy debate continues

Please login to join discussion
NDRRMA records recovery of 1,341 bodies; 4,996 in missing list since Bhotekoshi floods
Environment

NDRRMA records recovery of 1,341 bodies; 4,996 in missing list since Bhotekoshi floods

by Metakhabar
September 6, 2026
0

Kathmandu, Sept 6: A total of 1,341 bodies have so far been retrieved from various districts, while some 4,996 people...

Read more
Bhotekoshi flash flood: 199 dead bodies in unrecognizable condition managed

Aug 26 disaster: Sample collection from 1,181 dead bodies for DNA matching

September 6, 2026
Nepali Kickboxer Ghimire achieves title of world champion

Nepali Kickboxer Ghimire achieves title of world champion

September 6, 2026
Madi-Thori road blocked due to water overflow

Bhotekoshi flood: 3,071 people remain unaccounted for in Rasuwa

September 6, 2026
Top End T20 Series Nepal facing Pakistan today

ACC Premier Cup: Nepal fielding against Saudi Arabia

September 6, 2026

Aanjan Media Private Limited Kathmandu, Nepal

Chairman

Dhiraj Paudel

Registration No:

3634-2079/80

Contact

01-4521648
metakhabar7@gmail.com

  • About
  • Advertise
  • Privacy & Policy
  • Contact
  • Our Team

© 2022 MetaKhabar

No Result
View All Result
  • Home
  • News
  • Tech
  • Entertainment
  • Lifestyle
  • Society
  • Auto
  • Education

© 2022 MetaKhabar

Welcome Back!

Login to your account below

Forgotten Password?

Retrieve your password

Please enter your username or email address to reset your password.

Log In