• About
  • Advertise
  • Privacy & Policy
  • Contact
  • Our Team
Sunday, July 12, 2026
  • Login
Metakhabar
  • Home
  • News
    Preparation made to open new trekking route

    Preparation made to open new trekking route

    Apple farming successful in Ghunsa and Phaletar

    Exporting apples requires local government’s endorsement

    Weather to remain fair in most parts of country

    Light to moderate rain likely at few places

    Donald Trump pledges prosperity and strength in vision for America’s future

    Trump threatens Iran after Ayatollah Ali Khamenei’s funeral saw open calls for his killing

    New Zealand, India form ‘strategic partnership’

    New Zealand, India form ‘strategic partnership’

    UAE Minister for Foreign Trade Thani pays courtesy call on President

    UAE Minister for Foreign Trade Thani pays courtesy call on President

    Trending Tags

    • Trump Inauguration
    • United Stated
    • White House
    • Market Stories
    • Election Results
  • Auto
  • International
  • Business
  • Entertainment
    World of Dance Nepal 2026 Launched with U.S. Embassy Support

    World of Dance Nepal 2026 Launched with U.S. Embassy Support

    Music Video “Mutu Bhitra Dhadkan” Capturing the Beauty of Mustang Released

    Music Video “Mutu Bhitra Dhadkan” Capturing the Beauty of Mustang Released

    Trash barrier installed to capture floating waste in Bagmati River

    Trash barrier installed to capture floating waste in Bagmati River

    Young actor, entrepreneur, and social activist Krishna Sunar was honored

    Young actor, entrepreneur, and social activist Krishna Sunar was honored

    Weather to remain fair in most parts of country

    Possibility of rain in Koshi, Gandaki and Karnali

    Tongue piercing festival in Madhyapurthimi today

    Tongue piercing festival in Madhyapurthimi today

  • Sports
  • नेपाली
No Result
View All Result
  • Home
  • News
    Preparation made to open new trekking route

    Preparation made to open new trekking route

    Apple farming successful in Ghunsa and Phaletar

    Exporting apples requires local government’s endorsement

    Weather to remain fair in most parts of country

    Light to moderate rain likely at few places

    Donald Trump pledges prosperity and strength in vision for America’s future

    Trump threatens Iran after Ayatollah Ali Khamenei’s funeral saw open calls for his killing

    New Zealand, India form ‘strategic partnership’

    New Zealand, India form ‘strategic partnership’

    UAE Minister for Foreign Trade Thani pays courtesy call on President

    UAE Minister for Foreign Trade Thani pays courtesy call on President

    Trending Tags

    • Trump Inauguration
    • United Stated
    • White House
    • Market Stories
    • Election Results
  • Auto
  • International
  • Business
  • Entertainment
    World of Dance Nepal 2026 Launched with U.S. Embassy Support

    World of Dance Nepal 2026 Launched with U.S. Embassy Support

    Music Video “Mutu Bhitra Dhadkan” Capturing the Beauty of Mustang Released

    Music Video “Mutu Bhitra Dhadkan” Capturing the Beauty of Mustang Released

    Trash barrier installed to capture floating waste in Bagmati River

    Trash barrier installed to capture floating waste in Bagmati River

    Young actor, entrepreneur, and social activist Krishna Sunar was honored

    Young actor, entrepreneur, and social activist Krishna Sunar was honored

    Weather to remain fair in most parts of country

    Possibility of rain in Koshi, Gandaki and Karnali

    Tongue piercing festival in Madhyapurthimi today

    Tongue piercing festival in Madhyapurthimi today

  • Sports
  • नेपाली
No Result
View All Result
Metakhabar
No Result
View All Result
Home Business

Muglin-Pokhara road expansion drive: Demolition of structures in Dumre begins

Metakhabar by Metakhabar
June 5, 2023
in Business, Featured-news, News
0
First Coin and Banknotes Exhibition begins
0
SHARES
2
VIEWS
Share on FacebookShare on Twitter

Structures based in Bandipur rural municipality-1, Dumre of Tanahun are being demolished as part of the Prithvi highway expansion plan. A drive has begun to break down houses and huts that were constructed within the road section. According to engineer of Muglin-Pokhara Road Project (Eastern Section) Bishnu Pandey, five houses of Dumre Bazaar – the main commercial hub of Bandipur and entry point to Lamjung district – are being razed now. ‘The drive is underway to remove structures built within the road territory. As of now, five houses have been razed’, he informed, adding, ‘All the structures constructed within the road scope would be gradually demolished’. Most of the houses built long back in Dumre Bazaar were found within the road area. A plan was mooted to raze such structures by providing compensation.

The eastern part includes Anbukhaireni rural municipality, Bandipur rural municipality and Byas municipality. Preparation is also being made to remove the structures built in Anbukhaireni and Byas. He further informed as many as 631 structures would be removed from the section. Compensation amounting to Rs 2.245 million would be distributed to the rightful owner. The Muglin-Pokhara Road Expansion Project has expedited its works in two sections. The eastern section from Anbukhaireni to Jamune has made 30 percent progress, the project sources said. Blacktopping has started in seven-kilometer section of Anbukhaireni. Project chief Narendra Subedi said tht works have been expedited with a target to complete blacktopping of seven-kilometer in the current fiscal year.

The expansion drive was initiated in the eastern section in April 2021 after contract signing for the same in January 2021. In the 41.45-km road section, three big and four small bridges would be constructed. The contract was awarded to China Communication Construction for the eastern section. The government this year has allocated a budget of Rs 5.42 million for the Muglin-Pokhara road expansion. The four-lane road is being constructed with the loan assistance of the Asian Development Bank. The contract of Rs 6 billion 231 million was signed for the eastern section while it was Rs 7 billion 44.6 million for the expansion of western section. The four-lane road section will have 20-25 meter in each side.

Previous Post

Murrah buffalo bulls to be used for crossbreeding on 100,000 buffaloes

Next Post

Report on Nepal-India digital transaction submitted to Governor

Metakhabar

Metakhabar

Next Post
Remittance inflow increases 27.1 percent in six months

Report on Nepal-India digital transaction submitted to Governor

Please login to join discussion
Preparation made to open new trekking route
Business

Preparation made to open new trekking route

by Metakhabar
July 11, 2026
0

Myagdi, July 11: Preparation has been made to open new trekking route connecting Mudi-Gurja-Rughachour-Jaljala of Dhaulagiri rural municipality in Myagdi...

Read more
Apple farming successful in Ghunsa and Phaletar

Exporting apples requires local government’s endorsement

July 11, 2026
Weather to remain fair in most parts of country

Light to moderate rain likely at few places

July 11, 2026
Donald Trump pledges prosperity and strength in vision for America’s future

Trump threatens Iran after Ayatollah Ali Khamenei’s funeral saw open calls for his killing

July 11, 2026
New Zealand, India form ‘strategic partnership’

New Zealand, India form ‘strategic partnership’

July 11, 2026

Aanjan Media Private Limited Kathmandu, Nepal

Chairman

Dhiraj Paudel

Registration No:

3634-2079/80

Contact

01-4521648
metakhabar7@gmail.com

  • About
  • Advertise
  • Privacy & Policy
  • Contact
  • Our Team

© 2022 MetaKhabar

No Result
View All Result
  • Home
  • News
  • Tech
  • Entertainment
  • Lifestyle
  • Society
  • Auto
  • Education

© 2022 MetaKhabar

Welcome Back!

Login to your account below

Forgotten Password?

Retrieve your password

Please enter your username or email address to reset your password.

Log In